The windows are counted. Why does the quote still take so long?
By Anthony Wei, Founder & CEO

Imagine a window supplier quoting a project with a hundred frames. An experienced estimator has reviewed the architectural drawings and the acoustic, thermal and wind-load information. They understand the selection the job needs. Now someone has to create the frames in the estimating system, entering locations, sizes and frame types one by one.
For this team, choosing an AI take-off application means following the work beyond the count. The useful question is how much of the preparation can arrive in a form the estimator can check and use in the next step.
Start with a job your estimator has already completed
Use a completed drawing set, its reviewed window schedule and the corresponding estimate. Ask the estimator to show where the dimensions came from, which selections required judgement and which fields were simply copied into the system.
That walkthrough separates the work clearly enough to define a first application. It might extract opening references and dimensions, associate them with approved selections, and prepare draft entries for review. Technical selections and unresolved requirements can stay visible for the responsible person to decide.
Take a draft line into the actual estimating system
Choose several openings, including one with a detail that needed clarification. Review the draft against the relevant drawing and schedule. Then take an approved entry through the proposed handover into the software your team uses today.
Does the receiving system get the reference, size and selected frame information it needs? What still has to be typed? If an import or integration is required, make that part of the trial. A spreadsheet export is useful only to the extent that it helps the next person complete their work.
Check a correction as well as a clean example
Use a job where two documents differ, or where a drawing revision changed an opening. Check whether the discrepancy is visible, whether the estimator can correct the draft and which version reaches the estimate. Follow the correction through to the output so the same issue does not need to be fixed twice.
Compare the complete task
Record the time spent preparing entries, checking them, correcting them and completing the estimate. Keep the errors and omissions alongside the timing. These results let you judge whether the proposed application makes the team's daily work easier, and where it needs further development.
Before extending the scope, agree who maintains product mappings and estimating rules, how internal rates are handled and who supports changes to the existing software. Include those responsibilities in the ongoing cost, alongside the application build.
At TsquareAI, we use a real estimating job to identify the first useful piece of automation. Bring the drawings, the checked result and the step your team keeps repeating. We can work through how an application could prepare that work for them.